Garment production tracking in Excel
Track every order from PO to dispatch in one Excel system: fabric, trims, cutting, stitching, finishing and dispatch. The system builds a daily production report on its own and sends red alerts to WhatsApp when something falls behind.
What you can see in one place
- Which POs are on track, delayed or at risk
- Cutting, stitching and finishing progress for each order
- Fabric, trims and accessories that are short or pending
- Planned against actual output, and what the forecast expects
- Free stock against stock already booked to orders
The dashboard below is sample data, shown only to illustrate the layout.
The modules behind it
Orders and planning
- PPM File Addition: timeline
- Planning vs Actual: variance
- Forecast Analysis: AI prediction
Materials and stock
- Trims Card: shortage detection
- BOM Sheet: auto calculation
- Free vs Booked Stock: real-time
- Accessory Inventory: low-stock alerts
People and capacity
- Job Worker Capacity: live booking
- Attendance & Payroll: auto calculation
- KPI Per Merchant: real-time
Reports and alerts
- Auto Daily Production Report: 09:00 AM
- Automated Red Alerts: WhatsApp
From daily report to red alert
The Auto Daily Production Report is built every morning, at 09:00 AM by default, so nobody has to compile it. The logic layer compares actual output with the plan, and when an order runs late or a trim runs short, a red alert goes to the owner or merchant on WhatsApp.
Watch it work.
Excel working as an operating system for the factory. This demo shows the dashboard and the connected sheets.
A single update refreshes every department at once. This demo shows how a change in one sheet reaches all the others.
Your data stays safe
Your system runs on Microsoft platforms, so your data sits on Microsoft servers. It is encrypted in transit and at rest, backups run automatically and are versioned, so an earlier state can be restored, and access is role-based: each merchant, buyer or supervisor sees only what belongs to them.
Questions, answered.
Is Excel enough for a garment factory?
For many small and mid-size factories it can be, when it is set up as one connected system instead of many separate files. Whether it is enough for you depends on your order volume and how many people use it, and we discuss this honestly in the demo.
How is the daily report created?
The system builds it automatically, by default at 09:00 AM, from the data entered through the day.
What triggers a red alert?
The logic layer flags delays, shortages and variances against the plan, and sends the alert on WhatsApp.
Can several people update at the same time?
Floor staff enter data through a mobile form that syncs to SharePoint, so updates come in from many people without each one editing the same workbook.
Do we need to change how we work?
The system is built around how your team already works. We map your current process in the demo before building anything.
Last updated: 17 October 2026
Book a live demo.
We show the system on sample data and map it against how your business runs.
Book a live demo WhatsApp us